Our Terminix Story

One plan. One claim. The wrong floor.

This is the documented record of a Honolulu homeowner's Terminix termite damage repair claim. The contractor Terminix chose installed red oak where white oak was, left no expansion gaps, never sanded off the mill marks, and cut the floor short to meet 121 feet of baseboard he never removed. He admits the short cut in his own texts. A licensed contractor says $24,802.61 puts it right. Terminix has offered $15,000. Every claim on this site is backed by a photograph, a document, or Hawaii law.

The original white oak floorboard (green check) next to the red oak board the contractor Terminix chose installed (red X), hand-labeled Preexisting Floor

Left, red X: what Terminix installed. Right, green check: what was there before. Photographed September 21, 2026.

$24,802
Licensed contractor's estimate to do it right
Red oak
Installed where white oak was
$15,000
What Terminix has offered so far. $9,802.61 short, and the floor is still red oak